You don't have javascript enabled. Good luck with that.
Pencarian
Sudinsos Jakut Distribusikan Bantuan ke Warga Terdampak Rob di Pluit

N. Jakarta Social Sub-agency Distributes Assistance for Tidal Flood Survivors in Pluit

North Jakarta Social Sub-agency, Wednesday (11/20), distributed 500 food packages to tidal flood survival residents at RW 22, Pluit Urban Village, Penjaringan.

The assistance is provided to lighten their burden

North Jakarta Social Sub-agency Head, Rizqon Hermawan said the food packages were directly distributed to residents from the urban village.

Council Appreciates Acting Governor Teguh Monitoring Tidal Flood in Muara Angke

"The assistance is provided to lighten their burden," he said.

He added that his side will cooperate with urban village to make sure is any of survivors need something else.

Pluit Urban Village Head, Ahmad Faizal, explained the survivors are spread at 12 RTs in RW 22. His side has not opened a refugee post for residents affected by the tidal flood in Muara Angke.

"Thanks God the water has receded at noon. The water level was 10-15 cm," he explained.

His side is still deploying personnel to anticipate if the water increases and is impacted the residents.

There are 20 PPSU personnel, seven SDA taskforce, four Jakarta BPBD personnel, and four Tagana personnel standby on the location.

"We also have Satpol PP, Binmas, and Babinsa personnel there," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1701 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1117 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye810 personDessy Suciati